TPMAnalysisFab listTCM
EXAMPLE DATA — for mockup only
Client & analysis tool
Client: MaxisMStower
Export file: JHR-0001_TPM.std (MStower)
Maxis › MStowerEP (Edgepoint) › Open Tower
Tool is set by client. EP sites export to Open Tower instead.
TPM data
✅TPM submitted
Today 10:44 · 25 photos · 8 panels
✅Exported to MStower
Sent 11:02 · JHR-0001_TPM.std
Sent
Analysis result MStower · 29 Oct
Member stress checkFAIL
Fail if utilisation > 0.90 · max 1.18 · 4 members fail
| Member | Location | Section | Util. |
| Leg | P2 · Leg A | L100×10 | 1.18 FAIL |
| Diag. brace | P3 · Face 1 | L50×5 | 1.09 FAIL |
| Diag. brace | P3 · Face 2 | L50×5 | 1.04 FAIL |
| Horiz. | P4 · Face 1 | L45×4 | 0.92 FAIL |
| Horiz. | P4 · Face 2 | L45×4 | 0.84 PASS |
Visual defects from TPM 5 found · Major / Minor
!Rust Major
P1–P2 legs, base plates · pitting
!Bent bracing Major
P3 · Face 1 · diagonal
!Missing members Major
P5 · Face 3 · 1 horizontal
!Loose / missing bolts Major
P2 leg splice · 6 loose, 2 missing
!Damaged ladder & platform Minor
2 rungs bent · grating corroded
🎨Paint peel-off (overall tower)
Painting needed if > 50%
35 %
Verdict by scope
TCM required: YES
2 of 3 scopes required
Maintenance
Major rust P1–P2, bent brace P3, missing horizontal P5, 2 missing / 6 loose bolts
Required
Strengthening
4 members fail (util. > 0.90, max 1.18): add / upgrade members
Required
Painting
Paint peel-off 35%, not more than 50% of tower
Not required
Engineer approvalApproved
Ir. A. Example (Structural) · 30 Oct 2026, 09:15